• Contract amounts are not pulling over to WIP/job cost but all items are linked

    We have a contract that seems to be set up properly, but the contract amounts are not showing up in the WIP or job cost inquiries. All items in the contract are approved and linked to a job. The job is set up for 'use contracts'. I found one difference…
  • Commas missing in JC Billing WiP value groupings

    I noticed that on the JC//Reports/Billing/WIP with cut-off date that the one of the commas is missing in the value e.g. $11,179,128 is showing as 11179,128.00 which is missing a comma between the million and thousand groupings. How do I fix it because…
  • My Assistant: Jobs with unbilled WIP - how to get the amount of unbilled WIP to display?

    I use the automated notice via My Assistant called "Jobs with unbilled WIP older than 90 days" (we may have customized the length of time). I think it would be really helpful if the report could actually display the amount that is unbilled. (If for example…
  • Cost Based Invoice, Mark-up - How do I add my markup so it generated in the Change WIP?

    FormerMember
    FormerMember
    1st time generating a mark up on a cost based invoice and I am having trouble with my mark up table, it does not show available markups niether will it save the percentage in the one I set up. Please help.
  • Field for Unbilled vs Billed WIP on Report?

    I am creating a report in Report Designer to show all billable entries against a job. The report pulls from the Billing WIP tables - both Billed and Unbilled. Is there a way to mark each row to show which have come from which table? I'm searching for…
  • Missing WIP Records from Payroll

    We have a couple of jobs where all of the WIP records are not coming through to billing from payroll. It's not the complete job where the data isn't flowing through, but a particular cost code. The cost code flows through for other jobs. I have verified…