• How to connect Sage CRE Accounting with existing database

    Hello, i've database file. i need to load data in my sage cre 300. I've installed sage cre 300 in my local machine but not found database dump and database load application. Could you guys help here how to connect with this database? Thanks, …
  • Billing: Selective Line Item

    I made a mistake coding an item and billed the wrong job. I moved the item in AP and on only want to bill for the item to show only this item that it had been moved. What would be the easiest and cleanest way to create and bill for this? I tried to go…
  • Working from Home and Remote Printer

    I'm remoting in to our server to use Sage 300 CRE. I have a printer at home and I tried to install the printer on the server and redirect it so I can print checks. However Server 2008 OS is not compatible with my HP Printer. I'm told the server OS…
  • Contract allowances

    Good afternoon, Seeing if anyone has found a good way to account for contract allowances. If a contract has a built in allowance it's noted in the original contract, but trying to fid the best way to track and bill against that allowance. I haven't…
  • Miss our session at TUG? Attend our upcoming webinar on improving productivity in Sage 300 CRE Payroll by adding Sage HRMS.

    If you missed our session at the TUG conference, attend our webinar on the topic Improving Productivity in Sage 300 CRE Payroll by Adding Sage HRMS on Thursday, May 26, 2:00-3:00PM ET. Here are the details on the session: Who Should Attend? Administrators…
  • Exporting dates when using Report Designer or Inquiries

    When I export a report to Excel using a Report Designer report or from in Inquiry the dates always export as text. Is there any way to have them format as a date?
  • RE: Sending Report Designer reports to Project Manager with My Assistant

    Teresa, I would suggest reviewing the Sending Personalized Content tutorial on the MyAssistantTraining Youtube channel. https://www.youtube.com/user/MyAssistantTraining Note: Some of the field references may be considered out of date as we have…
  • Sending Report Designer reports to Project Manager with My Assistant

    I have a report working in Report Designer that I would like to be able to send the Project Managers only their jobs - but when I use My Assistant it sends all jobs. I use My Assistant for notifications and it works great, but this is the first time I…