When I go to install the 22.2 year-end version of 300, after installing 22.2 on server can I immediately install update 1 on the server? Meaning prior to making my rounds and stopping at 40 workstations. Then at each workstation, can I install 22.2 and then install update 1 after that? Or do I have to hold off on update 1 on server until 22.2 is first installed on workstations, then go back to server and install update 1 and then go back to every workstation and install update 1? This second option would require 2nd visits to each workstation. I looked thru the various year end guides and various release notes but the timing of update 1 as it relates to server and workstations was not addressed, or at least I could not find it.