Can ADP job cost within their system and import into Sage 300CRE by project and cost code at summary level? We don't want to mirror the timecards in Sage 300 to get job cost detail. Is it possible for ADP to track by job? How have you handled working with ADP for job costing? We don't seem to be getting a definitive answer from them.