I'm new to Sage 300 CRE. We are working on setting up the job cost - cost code list and reports. We are moving from QB. Does anyone that works for a underground utility (wets/drys) subcontractor want to share with me their cost code structure and a sample JC report? We do our bids in HCSS heavy bid which has several items to prepare the bid. I don't want to move over that list of items as our cost codes. Any ideas would be greatly appreciated. Thanks!