Equipment Maintenance looks to the hours so the employees can handle the oil changes on machinery.. I enter equipment allocation which changes the hours on the equipment. The allocation is a rough estimate of time machinery is used on the job for job cost. My employer is asking is it possible to keep track of both? Basically we need the equipment cost for the job, but maintenance needs the number of hours from previous oil change.