Drill Down report for Change Order items added to Cost code?

Hello

in the committed cost reports 6-1-12, I see the budget and I see the cumulative Change ORder number.  Is there a way I can drill down or get an itemized list of each change order that is hitting that cost code/budget?  Need to find out what numbers are included in the cumulative number shown in the Change Order sum.  thanks

Parents Reply Children
No Data