Updating cost types 6-9 in Sage 100

SOLVED

Hi There, I would like to add additional cost types that can be added to all jobs, is there a way to do this? The user defined options 6-9 I would like to re-lable. I cant find where to do this other than in 6-3 and that seems to be specific to each project.