Hello
in the committed cost reports 6-1-12, I see the budget and I see the cumulative Change ORder number. Is there a way I can drill down or get an itemized list of each change order that is hitting that cost code/budget? Need to find out what numbers are included in the cumulative number shown in the Change Order sum. thanks