• MRP Generation enhancement for items using Manual reorder method

    Starting with the October 2019 product update for Sage 500 version 2019 we have made a change to MRP processing user interface. As shown in the screenshots in the Material Requirements Planning Generation form’s Options tab we have replaced in the Selection…
  • Does MRP Generation look at Purchase order tables?

    When MRP Generation is running, does it look at the open PO's, what does it look at? Does it look at Header or Detail line tables? Or does it go by the PO Log? Reason for asking is that I see a lot of entries in the PO Log that are not in the Header/Detail…
  • Lead Time Formula vs Projected Lead Time

    If you specify both a Lead Time formula & Projected lead time in the Maintain Inventory, which does MRP consider? I did a average lead time calculation based on the last 15 months using the PO date vs the Receipt date and was going to update the Projected…
  • Creating Planned, Firmed, and Actual orders in MRP

    After the Generate Planned Orders has been run, the system will show all the suggested orders to create. The suggested orders is based on the MRP factors that have been selected on the Planned Orders tab. At this time, the work orders and purchase orders…
  • Product Configurator - Sage 500 ERP Manufacturing

    Has anyone implemented this module with Sage 500 Manufacturing in a discrete environment?