• PJC Job Related PO - and Items that are serial tracked

    Hi I have never had a client ask me for this before and I possibly wrongly assumed it was possible. I have turned Serial numbers and tried to enter a Job Related Purchase order for an Item that has serial numbers I get the message below If…
  • How to Reopen a Project Phase

    HI, I have a closed phase in a project and I'd like to re-open it. Is that possible? Thanks
  • PJC work in progress report

    I'm trying to figure out the WIP report in Sage. The report in PJC doesn't give me what I would consider to be a proper balance even when looking at the totals in the contract maintenance screen. My client and I have run this on live data and on the sample…
  • SAGE 300 PROJECTS AND JOB COSTING INTERGRATION WITH MICROSOFT PROJECTS

    Where can I find a document or a user guide on how to integrate Sage 300 2020 PJC and Microsoft Projects 2016. Please advice
  • PJC Material Return Using different Costing Method

    When i do a materials return in PJC it is using the Most recent cost instead of the Average cost set on that item. Is there something that am doing wrong or a setting that i should change in PJC? Sage 300 2020
  • When creating P/Os from O/E, is it possible to pass PJC info from the SO to the PO?

    I've tested this and searched for a while online but can't seem to find anything solid to confirm. It appears that PJC data is dropped when generating a PO from SO. Am I missing anything? Is it possible to have Contract/Project/Category flow through to…
  • Sage 300 2018 PU4 PJC Performance

    FormerMember
    FormerMember
    Anybody have any idea about the Sage 300 2018 PU4 PJC Performance? Sage300 v6.0 performance is fine but slow after upgraded to v6.5 PU4 (Sage 2018). The PJC UI always become “Not Responding” (But NOT hang). The result will come out 5-10 mins for each…
  • Opinions please - industrial equipment repair

    We have been using ACCPAC since the DOS days, at least since I started in 1994. Historically, we did a small amount of service and repair work, but the bulk of our business was distribution - simple in and out of product with no added value. In the…
  • PJC bug

    Sage 300 2018 (v6.5a) PU1 working fine Bugs in PU2 & PU3 if PJC Project setup as Task Type: Fixed Price Accounting Method: Project Percentage Complete Billing Type: Billable PJC Transaction -> PJC Costs -> input the related Project cost -> Detail…
  • PJC missing customer number - change from Internal to billed Job

    We are new to the PJC module and when we started to setup the jobs, we ASSUMED that we could add the customer numbers later...i ASSUMED wrong. Now, i have these jobs loaded with transactions and was wondering if there is a way of opening up the job so…
  • Job Cost Overhead Calc (PJC OH)

    I did the following - At the contract level I set the Overhead type to Percentage of cost on a job - set the % to 26.74 - entered and posted a cost and eq transaction ** I anticipated seeing my cost + 26.74% in my GL batch. I only see my cost…
  • PJC and barcode scanner

    Can anyone make a recommendation on how best to integrate barcode scanning to facilitate adding labor and items into Project Job Costing (PJC)?
  • How to reverse a job-related shipment transaction in Sage 300 ERP?

    Hi there, Our client has an issue regarding job-related O/E Shipment. After posing a job-related shipment, user noticed that unit price was wrongly entered. As the shipment is job-related, any fields in this screen are not editable anymore. Do…
  • Project Job Cost 6.2 and Payroll

    Is it possible to add the tax portion of a PJC related Payroll check. I have been able to add the job both in Timecard and Manual Check. I see the same column in Tax "Job Related" in the Payroll inquiry screen.But unable to figure out how to include…
  • How to link PJC to AR

    I'm to build a report based on project that lists all the invoices associated with that project - does anyone know what links I can use?