Good morning,
I'm trying to align our cost code with the 2014 AIA cost code format in Sage. Right now, it's formatted as xxxxx.xxx but I want it to be xx-xx-xx.
Does anyone know how i can change this format?
Thanks in advance!
Good morning,
I'm trying to align our cost code with the 2014 AIA cost code format in Sage. Right now, it's formatted as xxxxx.xxx but I want it to be xx-xx-xx.
Does anyone know how i can change this format?
Thanks in advance!
We have a product Contract Change Utility that will allow changing the contract structure.
http://www.musick-int.com/product/PjcContractChangeLiterature.pdf
We have a product Contract Change Utility that will allow changing the contract structure.
http://www.musick-int.com/product/PjcContractChangeLiterature.pdf
*Community Hub is the new name for Sage City