Day-End updates Vendor Costs - Stoppable?

SOLVED

Day-End will update your vendor costs based on the receipt costs from that day.  Does anyone know if or how to stop that from happening?  Currently we run a macro to Export the vendor tables, run day-end, then re import.  Would be nice to simply avoid the need to do this.

Thx

Parents Reply
  • 0 in reply to Jay Converse Acumen

    our options are set like that.  It's not the PO that changes.  

    If I place a PO for item ABC for $2 each (vendor table say $2 each), and 4 days later the vendor says all future prices are $2.50 each so we update the vendor tables; the PO still comes in a month later with the $2.00 cost and at day end, the vendor table gets updated back to $2.00 each automatically.

    I just want it to stop the receipts from automatically changing my vendor tables.  We only want that table affected when we manually update them.

    If it's not possible, then so-be-it; just thought I'd ask if I was missing something.  There should be an option to turn it off.  I'll add to the sage ideas site.

Children