Time Track not selecting for Job Cost

Client on 2019 and only wants to integrate between TT and JC.  I have integration to PR turned off for TT.  TT has 906 records, all of which have an N for the JC and PR updated flags.  Yet when I run the Selection in JC, nothing is selected, with ALL criteria on each line.

Why won't anything select?