PM Work Ticket (Estimate/Quote) Material tab line cost update post creation without deleting and readding of lines

PM Work Ticket (Estimate/Quote) created with steps and materials. New item pricing for IM module input due to increase from vendor a few days later.

Go to WT post creation and old pricing remains in Estimate.

How can we trigger an update to Materials -> Line Cost without deleting all the lines and readding the lines to pull the updated Standard Cost?

Parents
  • 0

    What is your Parent Item Costing Method?  Is it Standard Cost?  If so, the finished parent item will go into inventory at that cost when you have completed manufacturing.  That "cost" info you see is what i would call "budgeted cost" at the time the WT was created.  It is not actual costs until you issue material. 

  • 0 in reply to StefanouM

    Thank you for the reply.  The issue we have is pre release of the WT.  During estimation, the prices are wrong and we need to get the budget corrected before the WT can be released (raw materials were updated after estimate started).  We do complete/close at standard cost.