Welcome to the Sage 100 Support Group on Community Hub! Available 24/7, the Forums are a great place to ask and answer product questions, as well as share tips and tricks with Sage peers, partners, and pros.
My company has a policy where if the revision of an individual part or subassembly changes (like a cable changing from Revision B to C), the top-level assembly revision must also change (like 000 to 001).
Since many top-level assemblies may use the…
Hi.
we are currently on Sage100 Advanced 2021. We are a drop shipper which normally only sells the items it receives from overseas in the same box it is received in.
We are looking at grouping items as bundles and trying to sell as a collection. …
I am looking to utilize sales kits to add and remove parts on sales orders. However I want the sales kit pricing to be a roll up of the part prices and not have to put a price on the sale kit parent part. Individual part prices can change and I don't…
I don't have the work order/production module. What is the best way to incorporate labor rates into Sage 100 BOMs? Right now I'm set up using misc codes.
Hello, our company is new to Sage 100 and in the process of setting up Sage. My question is this, is there a way to setup alternate BOM's? The closest thing I can find are BOM "options" but according to Sage this should only be used at the top level assembly…
When we enter a new item code into "Item Maintenance," it used to create a new product in the system. However now when we enter a new product code, everything goes blank, but it says "NEW" right by the Description (as it would do before). Everything else…
We have several BOMs with Options that require removing one item and adding another when a specific option is selected. Without this checkbox checked to allow negative quantities, we have to use Option Interactions which can get very confusing. I would…
So we finally set up our email feature and after some tweaking emails now send perfectly fine to our customers. Our issue is that in the EDMM module where we create a default email message, even though a message is saved when we send electronic invoices…
I've noticed that if we fill in the Work order/sales order fields after creating a purchase order that when we then look at the item we just purchased it does not reflect in the Quantities section on the main tab that there is anything on a Purchase order…
I am having difficulty getting our items in item maintenance to show up on tab 6 under Sales Orders and Work orders appropriately. Am I missing a setup somewhere to make this work for all items? It works when we create a purchase order...
Hello.
I hope all is well. We have multilevel BOM's defined as a KIT type in the BOM system. We wanted the ability to create a sales order for a manufactured item that consists of several levels of BOM's. The reason we went with the kit type is that…
Hi, I was wondering if there is a feature that allows us to see an exploded item with in a work ticket? Essentially I have an item that has its own BOM and is a item on a work ticket. I want to be able to see the components of that item on the work ticket…
Hello
We just Update from sage 2013 to a 2016 Version, But now I am getting a message " User Limit exceeded" I did try the base knowledge but I could not fine any topic about this message.
If you have any suggestion please let me know
Thank you…
how to import ship zone under shipping rate maintenance for Sage 100 V4.5
Shipping Code already set "Actual" under Sales Order, item has it's own item weight, want to set up everything in the right place to do a calculation on freight for the sales…
I am new to this system so please be patient with me.
I have a question in regard to engineering changes that will effect active work orders.
Currently when a BOM needs to be changed, the current procedure is to delete the current planed work order…
I have one week of training on Sales order entry and BOM. Now my boss is pushing me to get the work orders up and running. I'd like to find a good tutorial, or some resources. Where do I start? Is there any hope for me? I've checked on youtube. There…
We have a packaging company with a large variety of items which are packed to order. As we don’t prepack, virtually all our sales are through kits with the option selected to “always explode”. We do have a bill of materials (BOM) for each kit as items…
I am setting up 4 users to remote into my server to access Sage Mas 100. I know there is a way to have them log in and have the program start automatically, but I can't seem to find it. Can anyone help? See below image...i need help figuring out what…