Running Sage 2017 SP1, with Excel Container
I have created an excel link for a large report that I'm going to pull several small reports from for distribution.
This runs perfectly if the linked excel report is open but not if it's closed.
I will be adding these reports to MS Scheduler.
I suppose I could run the master 1st and set it to leave it open, then schedule all the others.
The problem with that is the next night the report will not run because it is open.
Is there a flag or a step I'm missing to be able to use the excel workbook even if it's closed?
As always, thanks for your assistance.