Updating BOM Cost Amounts

I am new to Sage and in over my head as our former controller left without any transition.  I would like to update the Labor and Overhead rates in our BOM module.  We have about 400 products that have varying cost components, but all have labor and overhead at the same rate.  What is the easiest way to update multiple products in the BOM module?  Thanks in advance!!!!

Parents Reply
  • 0 in reply to BigLouie

    I believe so.  At the bottom of each BOM, in the Maintenance option, I see Labor - Operators, Labor - Packers and Overhead.  Each has a Quantity per Bill, Average Cost, and Cost of Bill field.  I would like to update the Cost of Bill for both labor component and the overhead component.  I would also like to make the changes effective as of 7/01/22.  I do not want to change any of the material component costs.  Any guidance would be GREATLY appreciated.

Children
No Data