Sage 100 migration taking WIP turning into Inventory

SOLVED

We are currently Migrating from Sage 50 to Sage 100 and about to go live. We have one particular item we sell that we put as a job in Sage 50 where all costs go to WIP and then an Inventory adjustment puts the item into inventory. For clarification we are buying round steel bars and eventually turn them into various size lengths Pin Shafts over time (usually not all at once). So we might have ten 4.875 x 101" and five 4.875 x 111" taken out of WIP and put into Inventory leaving 10,000 in WIP.

Is there any function in Sage 100 that allows you take adjustments to WIP to Inventory?