Browse By Tags

  • Planning work order material import for BOM change

    What is the best way to update planning work order material based on the updated BOM? There is no standard import template for MFGMAT. Users requested that they have three old components that is in 189 open work orders that "builds" phantom part# to…
  • Setting up intermediate codes for process driven BoMs that allow intermediates to be tracked but do not prompt a allocation upon WO generation.

    Hello All, So I'm trying to setup a BoM for a process driven product formula which would look similar to this: Phase 1 Instructions (Component type: Text, Type: Active) Input 1 Weight (Component: Normal, Type: Physical) Input 2 Weight (Component: Normal…
  • Web scheduling work orders problems

    The problem is that while importing plant from sage x3 it goes well, the file *.JSON contain all the information from sage x3, but when I opened web scheduling I can't run automatic scheduler (due to inexistence of work orders as show below)
  • Routings - Copy Routings

    I'm updating BOMs to including a packaging code. I can copy the BOM from the original product by entering the new product code however the BOM routings are not automatically copied over. Is there a way that routings can also be copied over?
  • There is still some subcontract in process that needs to be posted

    Run FUNWIPACC (Costing, WIP, In-process posting) , WIP accounting interface. I am not able to select the work order option. When I go into WIP Posting->Production Site>Entry Type it does not let me select the option Work Order. When I enter…