  • Planning work order material import for BOM change

    What is the best way to update planning work order material based on the updated BOM? There is no standard import template for MFGMAT. Users requested that they have three old components that is in 189 open work orders that "builds" phantom part# to…
  • Ability to Close a Work Order that is in Tracking Status "Pending" and is not going to be produced, and the same time client doesn't want to delete them due to Auditing requirement!

    Came across this requirement for two of my clients by now that just suspending a WO that is no longer is needed is not sufficient as it leaves its traces in ORDERS table and MRP may pick it up as resources for sales orders (user just found out after few…
  • Scanco Operations management Data Collector

    Hello All We do not utilize payroll in sage and I am attempting to import our labor into operations Mangement via Direct time entry DATA COLLECTOR. The system is unfortunately not returning any usable error messages (actually none at all.) Does…
  • Setting up intermediate codes for process driven BoMs that allow intermediates to be tracked but do not prompt a allocation upon WO generation.

    Hello All, So I'm trying to setup a BoM for a process driven product formula which would look similar to this: Phase 1 Instructions (Component type: Text, Type: Active) Input 1 Weight (Component: Normal, Type: Physical) Input 2 Weight (Component: Normal…
  • Web scheduling work orders problems

    The problem is that while importing plant from sage x3 it goes well, the file *.JSON contain all the information from sage x3, but when I opened web scheduling I can't run automatic scheduler (due to inexistence of work orders as show below)
  • Sage WO vs PM Cross Reference?

    Hi, Is there a cross reference list of what the WO tables/fields are now called/located in PM. I'm looking to make a new query for PM to replace what I had in WO coming from the WO9 table or WOO depending on Active or History. Thanks, Ryan
  • Lot Numbers

    I need to come up with a way to consume containers (what our product is packaged in) when a work order is closed. I have thought keeping the current BOMs for the "master BOM" (bulk BOM if you will) for each product and then doing a second BOM that puts…
  • Applying a change of standard operations/routings to firm and planned work orders

    Hi, We need to apply a larg number of changes to the set up/running times for our machines as we have found after running for a while that the intitial rates we put in are slightly off leading to a build up of error to loadings and capacity plans over…