How do I enter a per diem amount on a payroll check?

SOLVED

How can I enter a per diem amount on a payroll check? I usually make a separate check and I want to do it on payroll.

  • 0
    verified answer

    Per diems can be entered in the 5-2-2 window by selecting the next available row and entering the date, job, phase, cost code, comp code and department as if you were entering regular hours on a record. The only difference is the pay type and pay rate. Pay type for per diem is 8 and the pay rate is the amount of the per diem. No hours or pay group should be entered. In fact I believe the system will not allow entry of hours for pay type 8.

    Hope this helps.

  • 0 in reply to shelasgoodfello

    Yes, thank you, the type 8 was not set up. Anyway to not have it classified as payroll?

  • +1 in reply to Nadine1156
    verified answer

    What do you mean by "classified as payroll"? Do you mean appearing as "Labor" in the job costs or in the GL as a payroll liability?

    The check should be payroll and the amount of the per diem is added to the payroll check as "Adds". Unfortunately the per diem amount is added as "Labor" for job costing. That is something I wish Sage would allow you to change. Unfortunately I haven't been able to discover a way to alter this.

    On the GL, I believe Sage is be set so the per diem calculation is applied to the Travel expense account. not payroll liabilities. If your setup is applying per diem to payroll liabilities, you might check the Per Diem payroll calculation in the 5-3-1 window and make sure the calculation is set to the right expense accounts

    Hope this helps.

  • 0

    I enter per diem slightly differently.  I use a Payroll Calculation (5-3-1) labeled "Per Diem".  After all the hours are entered on the timecard screen, I switch to the "Calculations" tab and enter the Per Diem using the Payroll Calculation I created.  I enter a flat amount for the week and it's posted to the JOB/SHOP/OvH/Admin expense account that I set up in the Payroll Calculation.  This allows me to post the per diem to the job or shop, etc but keep it separate from the Labor cost.   

  • 0 in reply to Lynn Sterkel
    SUGGESTED

    When you do it that way you are not able to job cost it appropriately.  When you use the pay type peri diem on the timecards you can job cost to a specific job and it fills in the per diem calc on the calculations tab. If you only use the calculation then it divides the per diem between all jobs on the timecard which typically isn't correct 

  • 0 in reply to Char DeLange

    I should have clarified, our non-union construction company per diem is a flat amount per day and all employees receive the same per day amount.  Yes, my method divides the per diem between all jobs on the timecard but in our case, that typically works.  Our crews work on projects for weeks at a time so usually don't have more than two jobs on a time card.  The only time it doesn't work is when they received per diem for one project and not the other.  Our per diem cost is usually 1% or less than the total job costs.  Management decided that being able to separate per diem from labor was more important to them than knowing the job cost for per diem might by be off a few dollars.  If employees are working on several jobs in one pay period and some have per diem and some don't, then our method would not work.