• How to Reopen a Project Phase

    HI, I have a closed phase in a project and I'd like to re-open it. Is that possible? Thanks
  • Employee Number XXXX is not assigned to the Project

    A User is not able to add or capture a Timesheet in Sage 300 PJC and the system returns the error: " Employee Number 'XXXX' is not assigned to the Project ".
  • Sage 300 2018 PU4 PJC Performance

    FormerMember
    FormerMember
    Anybody have any idea about the Sage 300 2018 PU4 PJC Performance? Sage300 v6.0 performance is fine but slow after upgraded to v6.5 PU4 (Sage 2018). The PJC UI always become “Not Responding” (But NOT hang). The result will come out 5-10 mins for each…
  • Sage 300 US Payroll - Job Related - Accrual

    Hi All, I just need a clarification on this one, if ever you set an earning/deduction as accrual and the type is accrual not payment as shown in the image above, will this setup go to the cost of the project? Please advise on which earning/deduction…